DrawingReady
    Project Studio · Chapter 01 · Draw

    Set it up once. Watch it fill everything.

    Project Studio takes you from one drawing to a project that is ready for buyers, with a readiness score that shows exactly what is left. At 100%, Bricko ERP, the sales team, BrickoMart and the buyer listing are all filled from it.

    7Guided steps, drawing to listing
    91Approval questions, answered once
    100%Then everything else fills itself

    Scroll to set up a real project by one of Bricko ERP's users from its drawing set. The drawings are shown here with the builder's consent.

    01 DrawingSteps 1 of 7

    Upload the drawing.

    One CAD file. Bricko reads the site boundary, the roads, every building footprint and every tower, so nothing is traced or typed again.

    DWG
    13.09.26_EC drawing set R2.dwgEC drawing set · 2 buildings
    Reading
    • Plot boundary29,745.87 sq.m
    • Roads20 m DP road
    • Building footprints2 podiums
    • Tower outlines5 wings
    • Open space1,822.61 sq.m
    • Landscapetrees
    02 TowersSteps 2 of 7

    Towers rise from the drawing.

    The site becomes a 3D model you can orbit inside Bricko: towers, floors and units in their real places on the land.

    Read from the drawing0 / 54 levels
    2 · 5buildings · wings
    G+2P+22storeys
    75.10m to terrace
    860flats
    22shops
    27levels a building
    03 Units and pricesSteps 3 – 4 of 7

    Every floor becomes units. Price them once.

    Each floor plan is split into units with their own type and carpet area. Set a price list once, by unit, floor or tower. Try it on floor 12.

    1 BHK 82 BHK 8Building 1 · floor 12
    1 BHK · 322 sq.ft · floor 12– 2 BHK · 531 sq.ft · floor 12– All 16 homes on floor 12–

    Example rates. The prices on the model update as you move the sliders.

    04 PublishSteps 5 – 7 of 7

    Answer once. Pin it. Publish.

    The RERA number, possession date and an approvals checklist of 91 questions, answered once and reused in every report. Drop the pin and the project stands in the 3D city for home buyers.

    • RERA, possession and approvals0 / 91
    • Pinned on the city mapBricko Homes
    • Words, logo and banner3D view
    After setup

    100% ready. Everything else fills itself.

    When the project reaches 100%, the rest of Bricko is filled from it. Nothing is typed twice.

    Project Studio100%One drawing, seven steps, one set of records.
    • Bricko ERP

      BOQ, schedule, tasks and work orders for the site.

    • BrickoMart

      RFQs for the materials in the BOQ.

    • Sales

      Inventory, price lists and live availability.

    • Money

      Budget, demand schedule and collections.

    • Bricko Homes

      The listing, floor plans, 3D view and the map pin.

    Connected

    Nothing is typed twice.

    Project Studio shares one set of records with the rest of Bricko. Here is what comes in and what goes out.

    Comes in

    • Your drawingThe CAD file: site, towers and floors
    • Bricko AITowers, floors and units read from the drawing
    Chapter 01Project Studio

    Goes out

    • Bricko AI3D model, BOQ and schedule
    • Bricko ERPUnits, price lists, availability, budget and demands
    • BrickoMartMaterial requirements
    • Bricko HomesThe listing, the map pin and the banner
    Free to join

    Start with a drawing.

    Open Project Studio, upload the drawing and watch the readiness score climb.