Drawing in. BOQ out.
Upload the architect's drawing. Bricko AI takes off the quantities, builds the bill of quantities and the construction schedule together, and links every item to the floor it belongs to.
| Item | Unit | Qty | Amount |
|---|---|---|---|
| RCC M30 · slabs | cu.m | 2,140 | ₹1.52 Cr |
| Steel Fe550D | MT | 318 | ₹1.94 Cr |
| AAC blockwork 200 mm | sq.m | 14,860 | ₹1.12 Cr |
| Internal plaster | sq.m | 41,200 | ₹78.3 L |
- Drawing read · 2 towers, 14 floorsDone
- Quantities taken off1,284 lines
- Schedule linked to BOQ212 activities
Quantities taken off for you.
Bricko AI reads your architectural drawing and prepares the bill of quantities and the construction schedule together. 200 Bricko Credits per run, with 1,000 free credits to start.
Quantity takeoff from the drawing
Bricko AI reads the drawing itself, whether or not the layers are labelled neatly.
BOQ and schedule together
Every schedule activity knows its BOQ items, so cost and time move together.
Your rates first
Your own rate list is used where you have one. For the rest, Bricko AI suggests an approximate range.
Yours to check and change.
Built for how Indian builders actually work, on the web and on the phone.
Your areas are never changed
Unit areas come from your drawing as they are. Bricko AI does not adjust them.
Editable
Review every line, change quantities and rates, and add your own items.
Ready to use
The BOQ feeds work orders, material requests and the budget in Bricko ERP.
Nothing is typed twice.
This part of Bricko ERP shares one set of records with the rest. Here is what comes in and what goes out.
Comes in
- Project Studio · The drawing, buildings, floors and units
- Rate lists · Your own rates
Goes out
- Work orders · BOQ lines to award
- Materials · Quantities to buy
- Construction · The schedule as tasks
200
Pay per use. Nothing else.
One run uses 200 Bricko Credits. A credit is ₹1 plus GST, and a new builder account starts with 1,000 free credits. Bricko ERP itself is free.
Questions builders ask
What is a BOQ?
BOQ stands for bill of quantities. It is a document that lists every item of work in a construction project with its description, unit, quantity and rate, so the total cost can be estimated and contractors can be compared on the same basis.
What does a BOQ run cost?
One run uses 200 Bricko Credits. One credit is one rupee plus GST. New builder accounts get 1,000 free credits, valid for 90 days.
Which drawings can it read?
Architectural CAD drawings in DWG format. Other drawings, such as MEP, can be added to the project alongside.